News

Chairholder Delivers Invited Keynote at Robotics Forum 3rd July Hongkong University Science and Technology
Transforming Construction by Robotics Opening Note by Chairholder
Eugen und Ilse Seibold-Preis der DFG geht an Thomas Bock von der TU München
Chairholder gives Keynote on Robotic Construction at Congreso Europeo sobre Eficiencia Energética y Sostenibilidad en Arquitectura y Urbanismo EESAP8
Chairholder Delivers Opening Keynote at Ace Workshop at Ecole Centrale France on 5th July
Hongkong University of Science and Technology Keynote
ACE-Workshop
Chairholder is Scientific Committee Member and Delivering various Speeches at ISARC Taipei and as Director of IAARC Board is Planning Future ISARC and Academy Activities
ReBuild Italia Chairholder gives Keynote on Future Construction Systems
Chair Holder Contributes to Scientific Committee of Creative Construction Conference and is Presenting Chairs Research for Cairo in Egypt
Chairholder delivers Keynote on Robotic Construction Revolution at Asian Contractors Association
Chair Holder gives Keynote on Construction Robotics at Shapes of Logic Conference in Wroclaw
Chairholder Delivers Keynote on Robotic Built Environment at Future of green Architecture at Hochschule Wismar
Chairholder Kicks off new Double Degree Master at Politecnico di Milano between Departments of Architectural and Mechanical Engineering
Chairholder revives Honorary Professorship of Federal University Oriol according to Protokoll Number 8 of 27. January 2017
Chairholder receives Medall of Honor from RAACS president Kuzmin
Professor Bulgakow receives Certifikate from RAACS President
Chair Teaches Twice 4 Courses at Politecnico di Milano for 80 Students of Mechanical and Architectural Engineering
Chairholder at Hackathon: "RoboCon: fast+ furious robotic construction"
EU Parlament Presentation on Robotics by Chairholder

 

Teleconstruction Site


picture_1
picture_2
picture_3
picture_4

Tele-Construction Experimenting Site is an experimenting site located at Garching Campus, used for multiple purposes. This real site related approach enables technologies and sub-components that are embedded in the final products of those sub system or component manufacturing industries. Sometimes advanced industries are even able to transfer process technologies and management strategies between each other. The site is open for students and researchers to implement mock ups, experimental shelters/buildings, tele-construction experiments, distinguish and apply various demonstrator/prototype evaluation methods, use evaluation feedbacks for further development of the project in subsequent evaluation-development cycles.